<div dir="auto">Have you tried Airgas?<div dir="auto"><br></div><div dir="auto">Jim</div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Mon, Feb 13, 2023, 5:37 PM John Tamelier <<a href="mailto:jtamelier@eng.ucsd.edu">jtamelier@eng.ucsd.edu</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">Hello all,<br>
<br>
We have been having difficulty getting a cylinder of O2 8%/CF4. We <br>
placed an order in early November 2022 with Linde and have yet to <br>
receive a ship date for the material. We have three orders out, but need <br>
the material urgently. The shortest lead time we have found is 9 weeks.<br>
<br>
Does anyone have any contacts for purchasing this gas or other options <br>
for obtaining a cylinder of this gas? Is anyone else experiencing this <br>
type of lead time for gas cylinders?<br>
<br>
Thank you,<br>
<br>
John<br>
<br>
-----------------------------------<br>
John Tamelier, Ph.D.<br>
Interim Director - Nano3<br>
<br>
University of California, San Diego<br>
Atkinson Hall, 5th Floor Front Desk, M/C 0436<br>
9500 Gilman Drive<br>
La Jolla, California 92093-0436<br>
Phone: (858) 246-2735<br>
Fax:   (858) 534-9092<br>
E-mail: <a href="mailto:jtamelier@ucsd.edu" target="_blank" rel="noreferrer">jtamelier@ucsd.edu</a><br>
<a href="http://nano3.calit2.net" rel="noreferrer noreferrer" target="_blank">http://nano3.calit2.net</a><br>
----------------------------------<br>
<br>
<br>
_______________________________________________<br>
labnetwork mailing list<br>
<a href="mailto:labnetwork@mtl.mit.edu" target="_blank" rel="noreferrer">labnetwork@mtl.mit.edu</a><br>
<a href="https://mtl.mit.edu/mailman/listinfo.cgi/labnetwork" rel="noreferrer noreferrer" target="_blank">https://mtl.mit.edu/mailman/listinfo.cgi/labnetwork</a><br>
</blockquote></div>